EPC Concrete Floats Pontoon up to 20meter long & 5m Wide
Underwater welding of pipes, Underwater Cutting, Underwater photography & Inspection , Coral Reef Relocating, Underwater Cable Inspection, Quay Wall Block Placing & Installation
Dredging of Quay Wall Trench, Dredging with suction Pumps(Toyo Pumps) Beach sand, Dredging Works For Underwater Geo-Tube Sand Bund(Sill)
Islands, Ballasting, (a)continuous pontoon bridge (b) separated pontoon bridge (c) semi-submerged foundation
Horizontal Directional Drilling HDD(Non-Destructive Crossings) Open Channel method (Off-Shore Pipe Laying) Open Trench (On Shore Pipe Laying) Method
Breasting & Mooring Dolphin, Temporary Steel Platform, Caisson , Offshore Bridge Piers, Sheet Pile Jetty(Combi-wall), Secant pile Jetty
Breakwater, Quaywall, Boat Slipway, RoRo ramp, Rock Revetment, Groynes, Rock Sill, Beaches.